Development Engineering Services
The Development Engineering Services division is part of the Engineering Department and is responsible for the planning, design, review, and construction inspection of water and sewer facilities; and the facilitation of streetlights for developer-funded projects. Development Engineering Services maintains a plan-check tracking system and tracks all developer-funded project milestones through all phases of the project to maintain quality control.
The Standards Manual provides a detailed description of the procedures and policies to be followed during any developer-funded project. JCSD applies fees to offset the public-service cost of a new development. The “Advance Payment against Actual Cost” funds various functions such as plan check, inspection, and other services required to implement the project.
Before, During, and After Construction
JCSD Engineering staff helps ensure that construction projects, for water and sewer services, meet the standards and specifications within JCSD's Standards Manual. Below are required steps to get started:
- Availability Letters - Developers are required to obtain a Water/Sewer Availability letter for all projects that involve water and/or sewer services. To obtain a Water/Sewer Availability letter, please submit a letter to JCSD requesting availability within the project, describing the type of project, a map showing the property requiring water and/or sewer service, and a $2,800.00 deposit for either Parcel Maps or Tract Maps. Once the request is received, the development consultants will provide feedback, if needed, and staff will submit the request for approval to the Board of Directors. Please click here to view a sample availability letter.
- Plan-Check Procedures - Once the Water/Sewer Availability letter is approved by the Board of Directors, plan- checking service can begin, which ensures that plans meet the specifications approved by the Board of Directors. JCSD specifications can be purchased at the JCSD office. Please review the Plan-Check Procedure and fees (PDF Instructions on Plan Check and fees) for a full description.
- Pre-Construction Meetings and Inspections – Pre-construction meetings are mandatory and conducted with JCSD’s inspector and supervisor, or their representatives, tract or job superintendent, and a City of Jurupa Valley or City of Eastvale representative and are conducted after items on the Pre-Job Checklist have been completed by a JCSD representative. For complete procedures for Pre-Construction Meetings, Video Inspections, Pre-Occupancy Inspections, Final Inspections for Tracts, Individual, Plot Plan and District Projects, please review the Procedures for Pre-Construction Meetings .
If you have any questions, please call our Development Engineering Services staff at (951) 685-7434, Monday thru Friday, 7:30 a.m. – 5:30 p.m.:
- Nicole Smith – Extension 140 nsmith@jcsd.us
Development Engineering Services PDF Forms
For your convenience, you can download the following Development Engineering Services forms:
Developers Handbook Revised July 2016 Final
Food Service Establishment Flow
Food Service Establishment Survey Form
Improvement Around Meter Boxes
Rates/Charges/Deposits as of 1/1/2021
Tract Pre Construction Meeting
Tract Pre-Occupancy Inspection
Necessary Forms for Industrial Applications
Brine Line Class 1-3 Discharge Permit Application