Jobs For Bid
| |
|
Addendums |
Contract |
Date of Award |
Contractor |
Status |
| PN# |
Project Name |
1
|
2 |
3 |
Amount |
|
|
In Process
|
Complete |
|
| 3545 |
CFD Meter Replacement Project |
|
|
|
|
|
TBU, Inc |

|
|
|
| 3463/2896/3474 |
Bain Street Pressure Reducing Station Site and Facilities Improvements, Indian Hills Facilities Improvements Tank Piping Modifications, Standby Generator Addition |
|
|
|
$967,000 |
9/26/11 |
Genesis Construction |

|
|
| |
|
|
|
|
|
|
|
|
|
| |
Eastvale Community Center Grading |
|
|
|
|
5/11/11 |
LL Brown Engineering
|

|
|
| |
Harada Heritage Park Upgrades |
|
|
|
|
5/25/11 |
Braaksma Construction |

|
|
| |
CDA Chino II Desalter 88 Valves Replacement Project |
|
|
|
|
7/5/11/By CDA |
Shea Construction |
|

|
| 2933 |
Demolition at Well No. 27 Site & Associated Work |
|
|
|
$28,000 |
Awarded 7/25/11
|
Robles Pipeline Laying Inc.
|
|

|
| 3449 |
CDA Well Nos. 6, 7 and 8 Blow-Off Piping Modification |
|
|
|
$72,500 |
4/7/11 |
Genesis Const.
|
|
 |
| 3500/3539 |
Waterline Replacement in Cul-De-Sac Easement and Tie-In & Valve Repl. in Felspar/56th St & 56th St Booster Station |
|
|
|
$205,200 |
4/11/11 |
TA Rivard |
|
 |
| 2879 |
Plant 1 Facility Upgrade
|
|
|
|
$1,118,590 |
12/13/10 |
4-Con Eng |

|
|
| 3375 |
Well 17/18 IXP Ph. 2 |
|
|
|
$1,013,809 |
10/25/10 |
SCW
|
|

|
| 3359 |
Well 6, Retrofits Wells14,15 Pump to waste
|
|
|
|
$1,391,819 |
10/25/10 |
SCW
|
|

|
| 2760 |
Florine LIft Station
|
|
|
|
$1,529,796 |
08/09/10 |
Downing Construction
|
|

|
|
3084/3086
|
Teagarden IXTP Wells, Emergency Generator & Building Mods (3084DP) & On-Site IX Plant Improvements (3086DP
|
|
|
|
$1,562,395 |
07/26/10 |
Pacific Hydrotech
|
|

|
|
3360
|
Waterline Replacement - Ben Nevis/Conning/Lorita |
|
|
|
$724,013 |
6-28-10 |
CP Construction
|
|

|
|
2979
|
Electronic Meter Reading Program
|
|
|
|
$306,630 |
|
Concord Util.Svs. Inc
|
|

|
|
3360
|
Waterline Replacement - Ben Nevis/Conning/Lorita
|
|
|
|
Rejected |
|
|
|

|
|
3397
|
Exploratory Borehole Drilling and Testing at the Galleano, Oda and IDI 3A and 5A Sites.
|
|
|
|
$ 573,000 |
10-12-09 |
Layne Christensen Co.
|
|

|
|
3283
|
JCSD Headquarters, On-Site Sewer Improvements |
|
|
|
$ 234,018 |
01-12-09 |
Nikola Corporation
|
|

|
|
2904
|
Plant 1 100-Year Flood Protection |
|
|
|
$ 646,475 |
01-12-09 |
Rock Structures, Inc.
|
|

|
|
2896
|
Sunnyslope 11.8 MG Reservoir, Gradng, Storm Drain, Site Improvements |
|
|
|
$ 8,886,700 |
11-10-08 |
SCI, Skaar Construction
|
|

|
|
2888/2937
|
Waterline Replacement in Jurupa Road Between Van Buren Boulevard and Agate Street and Jurupa Road Sewer Improvements Phase 1 and Phase II |
|
|
|
$ 2,173,450 |
09-22-08 |
MCC
|
|

|
| 3114 |
1110 and 980 Zone Reservoir Facilities Erosion And Sediment Control Project |
|
|
|
$ 141,854
|
04-14-08 |
CP Construction
|
|
 |
| 2628 |
30 Inch Diameter Etiwanda Avenue Water Supply Pipeline |
|
|
|
$ 2,067,345 |
09-08-08 |
Ken Thompson Construction
|
|
 |
| 2888 |
Waterline Replacement Valley Way from 34th to 37th |
|
|
|
$ 390,661
|
08-07-07 |
CP Construction
|
|
 |
| 2247 |
42 Inch Waterline in Bellegrave Avenue from Etiwanda Avenue to Van Buren Boulevard |
|
|
|
$ 1,553,234
|
05-14-07 |
SJ&B Group
|
|
 |
| 2946 |
Well Nos 17 & 18 Chlorine Generation System |
|
|
|
$ 342,900
|
04-09-07 |
Fleming Environmental Incorporated
|
|
 |
| 2888 |
Agate Street Pressure Reducing Station Relocation and Waterline Replacement in Jurupa Road Between Van Buren and Agate |
|
|
|
$ 221,115
|
03-12-07 |
Merlin Johnson Construction
|
|
 |
| 2772 |
Well 25 Equipping |
|
|
|
$ 1,949,595
|
02-14-07 |
EAR Construction & Engineering
|
|
 |
| 2946 |
Well Nos 17 & 18 Ion Exchange Treatment Facility |
|
|
|
$ 3,389,251
|
11-13-06 |
DenBoer Engineering & Construction
|
|
 |
| 2930/2247 |
Furnishing Welded Steel Pipe, CML/CMC for Bellegrave Avenue Waterline and Etiwanda Avenue Waterline |
|
|
|
$ 989,692
|
10-31-06 |
Ameron International
|
|
 |
| |
Second Floor Tenant Improvements |
|
|
|
|
09-11-06 |
BBS Construction
|
|
 |
| 2664 |
Well 23 Equipping |
|
|
|
$ 984,777
|
03-27-06 |
SoCal Pacific Construction
|
|
 |
| 2521 |
Roger D. Teagarden IxTP Expansion Rebid |
|
|
|
$ 2,279,176
|
03-27-06 |
Metro Building & Engineering Corporation
|
|
 |
| 2663 |
Well 22 Equipping |
|
|
|
$ 544,000
|
12-12-05 |
SoCal Pacific Construction
|
|
 |
| 2772 |
Drilling, Construction and Testing of Future Water Well 25 |
|
|
|
$ 269,379
|
12-12-05 |
Bakersfied Well & Pump
|
|
 |
| 2607/2712 |
Master Plan Sewer Reach III-Hall Avenue Extension, Master Plan Walters Street Waterline, Sewer Main Repair in Harrel Street |
|
|
|
$ 1,376,320
|
11-30-05 |
SJ&B Group
|
|
 |
| 2677 |
Furnishing and Erecting 1110B 6.0 MG Welded Steel Water Storage Reservoir |
|
|
|
$ 1,958,521
|
10-11-05 |
CB &I Construction
|
|
 |
| 2484/2624 |
Master Plan Sewerline for Archibald Avenue Reach IV, Master Plan Sewerline Thru Tract 31643 & 31961 Reach II |
|
|
|
$ 2,721,023
|
09-08-05 |
SJ&B Group
|
|
 |
| 2844 |
870 Zone Pipeline Storm Drain Improvements |
|
|
|
$ 583,849
|
08-22-05 |
Weka Incorporated
|
|
 |
|
|

|